Job Summary
The primary responsibility of the Planner / Scheduler is to assure that jobs are produced on time and machine utilization is optimal. In addition, as urgent orders / jobs arise the planner shifts jobs within the plant or back to the master scheduler to assure the customer's needs are met.
- Create jobs for standard and internal orders to fulfill customer requirements as well as maintaining corporate min / max levels.
- Reroute jobs to keep plant utilization optimal, OT low, and shipments balanced across multiple production lines-where possible.
- Review product mix requirements and machine capabilities, and advise when additions for product mix may be necessary to maximize utilization.
- Review / report on lead times for product classes with materials manager as well as the sales and marketing team where prudent.
- Additional assigned duties / reports as needed by the local materials manager.
- Build shop paper / production packets with all relevant details.
- Coordinate KanBan stocking efforts with Material Control Coordinator as needed, communicating shortfalls or scheduling delays with sales team.
- Experience in scheduling multi-line production facilities.
- 2 or 4 year degree in business administration or related field.
- High degree of skill in MS Excel, and Oracle preferred.